Quick- Clamping

Formerly, changing the membrane was a time-consuming, complicated and costly business. The membrane had to be preheated to pretension it after loosening a large number of screws, and several persons were required to install it.

This work is no longer necessary thanks to the "Quick-Clamping System" patented by Meier Solar Solutions. The quick-clamping mechanism that was developed especially for this reduces the time required to replace worn membranes to less than 20 minutes. Post-tensioning is also possible if required, this significantly lengthens the service life of the membranes.

The patent held by Meier Solar Solutions saves time and money thanks to shorter downtimes and can be retrofitted easily to many types of laminators.

Meier Solar Solutions presents the world’s most effective laminator in Valencia

Meier Solar Solutions GmbH will be presenting the newgeneration of laminators at the 25th EU PVSEC...

Meier Solar Solutions is in the TOP 100

The TOP 100, which distinguishes the most innovative companies in Germany, was published in...

Clients attain excellent test results from ÖKO-TEST magazine

Meier Solar Solutions GmbH from Bocholt in North-Rhine Westfalia, the global market leader in...


Show all news